-
14-202 (Cantilever Bridge2)
https://sonicconcrete.ca/wp-content/uploads/2012/02/14-202-Cantilever-Bridge2.jpg
The Kicking Horse Canyon Park Bridge was replaced as part of a massive improvement project of the Trans-Canada Highway 1.
-
14-201 (Cantilever Bridge1)
https://sonicconcrete.ca/wp-content/uploads/2012/02/14-201-Cantilever-Bridge1.jpg
The Kicking Horse Canyon Park Bridge was replaced as part of a massive improvement project of the Trans-Canada Highway 1.
Previous Image
Next Image
Located just east of Golden, between 6 Mile Hill and a rest area, this innovative cantilevered structure takes advantage of a bend in Kicking Horse River. Some of the challenges of this project included:
- Winter work
- Midnight pours
- Tight timeline
Using our experience and knowledge of Performance Concrete, we completed our contribution to the project in 24 months.